Epics and stories

Stride breaks work into three layers — epic, story, task — and maps them onto Linear's primitives. This page is the reference for what each layer is, where it lives, and how the /linear commands use them.

Above all three sits VisionVISION.md at the repo root, written via /vision. Epics and stories carve up the work; the Vision is what they're carving up toward. When /linear:plan-work asks whether a description is epic-sized or story-sized, the answer should trace back to a Vision outcome.

The mapping

LayerLinear primitiveWhere it lives
ProductProjectStride >>> — the whole-product container
Epic (named initiative)Parent issue with sub-issuesCreated by /linear:plan-work when the description is epic-sized; title prefixed Epic:
Story (slice of value)Issue, optionally a sub-issue of an epicCreated by /linear:plan-work; ships as one PR
Task (unit of work)Atomic commitCreated during /linear:start as the branch accumulates commits

Why parent issues, not milestones?

Linear's own Parent and sub-issues docs frame the choice cleanly:

"Consider creating sub-issues when a set of work is too large to be a single issue but too small to be a project."

That's stride's epic. A milestone is a date-bound chunking marker inside a project — it has no body, no status, no place on the board. A parent issue is a real card with all of those, so the umbrella moves through the lanes alongside its sub-issues, the narrative lives on the card, and a non-engineer scanning the board sees the epic as an actual unit of work. Milestones still have a place — they're the right answer when the chunking is "ship before X date" rather than "this is a multi-story body of work" — but for stride's epic concept, parent issues fit better.

What each layer is

Epic. A named initiative made of multiple stories. Too big to ship as one PR. Has a stakeholder-recognisable name like a feature or theme. Lives as a parent issue with sub-issues for each story. Title carries the Epic: prefix so the umbrella is visible at a glance on the kanban board.

Story. One deliverable. Ships as one PR. Reverts cleanly. Sits as a sub-issue under an epic when one exists; otherwise sits directly in the project.

Task. One atomic commit. Stride's task layer lives in git history, not Linear's sub-issue feature. Each commit is one task-sized idea, and the PR ships them together as a coherent story.

When in doubt about epic vs. story, ask: can this ship as one PR? If yes, it's a story. If no, it's an epic. Premature epics are clutter; missing epics are confusion.

How epics work

When /linear:plan-work recognises an epic-sized description, it does three things in order:

  1. Drafts the parent issue using EPIC-TEMPLATE.md. The body has four sections — Why this matters / What success looks like / What we agreed / What we won't touch — strategic only, no implementation detail. The title is prefixed Epic: so the umbrella is visible at a glance on the board.
  2. Saves the parent first so its ID is available for the sub-issues that follow.
  3. Drafts each story as a sub-issue with parentId set to the parent. Stories use the regular issue template — they're stories that happen to have a parent.

After the work starts, the parent moves through the lanes like any other card (/linear:start opens a story, /linear:finish closes it; when the last sub-issue ships, /linear:finish prompts to mark the parent Done too).

For a visual mock-up of the parent and the sub-issues panel as Linear renders them, see Example: Epic card. For one of those sub-issues fully written out against the issue template, see Example: Story card.

The strategic frame lives on the epic; AI-implementable detail lives on each sub-issue. That split is deliberate — an epic body that tries to enumerate all the implementation steps becomes a place where the same scope conversation happens twice (once on the epic, once on each sub-issue), and the sub-issue is the one a developer actually reads when they pick up work.

Plan a few, ship, replan

When /linear:plan-work creates an epic (parent issue), it asks for the first 1–3 stories — not all of them. After the first lands, run /linear:next-steps against the epic and plan the next 1–3 — same loop, fresh context.

Why plan 1–3 (agile)What planning all of them at once (waterfall) costs
You only know enough to plan a few stories well — beyond that you're guessingLocks in design decisions before requirements force them
Each shipped story changes the context — story 4 might look different after 1–3 landThe backlog goes stale before you reach it
1–3 fits in working memory; the user can review them as a coherent setBulk creation bypasses real review and bloats the board
Leaves the epic open to act, then adjust — feedback from a shipped story shapes the next planPretends the future is knowable; closes doors before you need to

How the /linear commands map to layers

CommandLayer it operates on
/linear:plan-workEpic and story creation. Asks the sizing question; routes epic-sized work through parent-issue creation, story-sized through issue creation (optionally as a sub-issue of an existing epic)
/linear:startStory → atomic commits. Surfaces the parent epic (parent issue) or milestone if any; opens a branch and PR for the story
/linear:fixStory (after PR review) — applies reviewer feedback as new commits
/linear:finishStory closure. Marks the story Done; if it was the last open sub-issue in its parent epic (or last open story in its milestone), prompts to mark the epic/milestone done
/linear:next-stepsStory selection within a project, parent-issue epic, or milestone. Offers an epic filter listing both parent-issue epics and milestones when either exists

Two axes: decomposition and flow

Epic → story → task is decomposition — how big a unit of work is. That's orthogonal to flow — where a unit sits on the kanban board (Backburner → Backlog → Todo → Doing → In Review → Done).

AxisQuestion it answersReference
DecompositionWhat is this work, and how big?This doc
FlowWhere is this work right now?Kanban process

A story sits somewhere on the kanban lanes. So does its parent epic. So do the child tasks once work begins. Parent-issue epics group sub-issues by decomposition and flow through the lanes themselves — the umbrella card moves Backlog → Doing → Done alongside its sub-issues. Milestones, when used for date-bound tracking, group by decomposition only; they don't move through flow.